PHASE 1
PHASE 2
Develop a detailed lighting design scheme from approved concept design proposal
Deliverables from the development phase include:
---> Lighting plans with dimensions for fixture installation
---> Lighting plan with control zoning to inform fixture circuiting
---> Lighting equipment schedule for fixture acquisition
---> Lighting control (load) schedule for fixture circuiting
---> Light fixture cut sheet package to aid in the understanding of individual fixtures and components
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 8